Plug-in solar / Colorado
Plug-in solar law
Colorado plug-in solar law
Colorado plug-in solar law: enacted. The limit is 1,920 W.
Law status checked November 23, 2026. This is general information, not legal advice. Confirm with your utility before you connect a device.
- Bill
- HB26-1007 (Improve Customer Use Distributed Energy Resources), C.R.S. 40-2-140
- Status
- Enacted
- Signed
- May 7, 2026
- Effective
- August 12, 2026
- Maximum output
- 1,920 W
Maximum output
Bill text:
"PORTABLE-SCALE SOLAR GENERATION DEVICE" OR "DEVICE" MEANS A SINGLE PHOTOVOLTAIC SYSTEM PER ADDRESS AND ASSOCIATED EQUIPMENT THAT: (I) IS DESIGNED OR COMMISSIONED TO SUPPLY A MAXIMUM POWER OUTPUT OF NOT MORE THAN ONE THOUSAND NINE HUNDRED TWENTY WATTS TO THE ELECTRIC GRID; AND (II) IS LABELED AND LISTED BY A NATIONALLY RECOGNIZED TESTING LABORATORY.
Certification and safety
"LABELED AND LISTED BY A NATIONALLY RECOGNIZED TESTING LABORATORY"; must include "A FEATURE THAT PREVENTS THE DEVICE FROM ENERGIZING THE ELECTRIC GRID DURING A POWER OUTAGE." From Jan 1, 2027 devices over 391 W that are not "UL LABELED AND LISTED" may not be sold, leased or rented in the state. Devices of 391 W or less are exempt from building-code and product-listing provisions "THAT WOULD REQUIRE ALTERATIONS TO THE BUILDING'S ELECTRICAL WIRING." The operative section does not name UL 3700.
Utility notice and approval
Provider "SHALL NOT REQUIRE A CUSTOMER TO: (I) OBTAIN THE PROVIDER'S APPROVAL ...; (II) PAY THE PROVIDER A FEE ...; OR (III) INSTALL ANY ADDITIONAL CONTROLS OR EQUIPMENT BEYOND WHAT IS INTEGRATED ... PURSUANT TO THE UL LISTING." Provider "MAY REQUIRE A CUSTOMER TO NOTIFY THE PROVIDER ... BY INDICATING THE PRESENCE AND SIZE OF THE DEVICE IN KILOWATTS." One device per wall outlet per address. Act also directs PUC meter-collar-adapter rules by Dec 31, 2026.
Landlord and HOA rules
From Jan 1, 2027 an HOA/common interest community rule that unreasonably prohibits a device is void; a device counts as an energy efficiency measure under C.R.S. 38-33.3-106.7; a real property owner may require reasonable restrictions on installation, use or operation.
Other conditions
Highest cap of any state found (1,920 W). Text read from leg.colorado.gov signed-act file 116074; the act-subject-to-petition clause gives August 12, 2026 as effective date if adjournment is May 13.
Sources
Related
Plug-in solar overview, is plug-in solar legal and plug-in solar kits.