Connecticut plug-in solar law

Connecticut plug-in solar law: enacted. The limit is 1,200 W.

Law status checked November 23, 2026. This is general information, not legal advice. Confirm with your utility before you connect a device.

Bill
HB 5340 (2026), Public Act 26-127, Sec. 9
Status
Enacted
Signed
June 4, 2026
Effective
October 1, 2026
Maximum output
1,200 W

Maximum output

Bill text:

"portable solar generation device" means a solar photovoltaic generation device that (1) is not permanently affixed to a structure, (2) has a maximum power output of not more than one thousand two hundred watts, (3) is designed to be connected to a building's electrical system through a standard one hundred twenty volt alternating current outlet located behind a customer's electric meter

Certification and safety

"(5) meets the requirements of the State Building Code, (6) meets the requirements of the National Electric Code (NFPA-70) and the Institute of Electrical and Electronics Engineers (IEEE 1547), (7) is certified by Underwriters Laboratories or an equivalent nationally recognized testing laboratory, and meets the requirements set forth in Underwriters Laboratories Standard Number 1741, as amended from time to time, (8) includes a device or feature that prevents the system from energizing the building's electrical system during a power outage" The statute names UL 1741, not UL 3700.

Utility notice and approval

Exempt from interconnection-agreement requirements of PURA, "provided not more than one such device may be used behind a customer's electric meter." Utility may not require approval, fees (except charges incurred through use) or added equipment; not liable for damage. No customer notification requirement in the text. Device must carry a consumer warning that excess generation is charged as usage unless the customer has a net-metering-capable meter.

Landlord and HOA rules

None in Sec. 9. Sec. 9(b): nothing exempts the device from the State Building Code, Fire Safety Code, Fire Prevention Code or local ordinances. Sec. 10 directs the State Building Inspector and Fire Marshal to consider code provisions for installation.

Other conditions

Sec. 9 is part of an omnibus renewable power bill.